Nhất Tín LogisticsDevelopers
Operate

Go-live checklist

Checklist before moving the integration from sandbox to production.

Before enabling production

  1. Confirm the production base URL and production credentials.
  2. Ensure logs do not expose passwords, access tokens, or refresh tokens.
  3. Verify handling for 400, 401, 429, and network errors.
  4. Prepare rollback to sandbox or a feature flag to disable the integration if production incidents occur.

On this page