Operate
Go-live checklist
Checklist before moving the integration from sandbox to production.
Before enabling production
- Confirm the production base URL and production credentials.
- Ensure logs do not expose passwords, access tokens, or refresh tokens.
- Verify handling for
400,401,429, and network errors. - Prepare rollback to sandbox or a feature flag to disable the integration if production incidents occur.